IBM Power 9 Models
Choose the end-of-life Power 9 model you own, then see the processor, workload, and Power 11 replacement facts that belong in the upgrade quote.
Every Power 9 model below is now an upgrade decision. Open the exact machine type to see what the server can carry today, what has reached its limit, and which Power 11 model belongs in the replacement comparison.
Do not size the new server from the model name alone. Bring the active processor feature, peak workload, memory, storage, adapters, operating-system release, and software tier into the quote.
IBM Power S914 (9009-41A)
The 9009-41A reached its support transition. Compare its processor feature, CPW, IBM i tier, and capacity with S1112 or S1122.
9009-41GIBM Power S914 (9009-41G)
The 9009-41G is end-of-life Power 9 hardware. Compare its processor feature, CPW, IBM i tier, and capacity with S1112 or S1122.
9009-22AIBM Power S922 (9009-22A)
The 9009-22A reached its support transition. Compare its processor, IBM i limit, memory, storage, and I/O with Power 11 S1122.
9009-22GIBM Power S922 (9009-22G)
The 9009-22G is end-of-life Power 9 hardware. Use its processor feature and workload to size Power 11 S1122.
9009-42AIBM Power S924 (9009-42A)
The 9009-42A reached its support transition. Use its processor, CPW, P20 tier, memory, storage, and I/O to size Power 11 S1124.
9009-42GIBM Power S924 (9009-42G)
The 9009-42G is end-of-life Power 9 hardware. Use its processor, CPW, P20 tier, memory, storage, and I/O to size Power 11 S1124.
9008-22LIBM Power L922 (9008-22L)
The 9008-22L is end-of-life Power 9 Linux hardware. Compare its workload, memory, storage, and I/O with Power 11 L1122 or L1124.
9223-22HIBM Power H922 (9223-22H)
The 9223-22H is end-of-life Power 9 hardware. Match its SAP HANA, AIX, IBM i, or Linux workload to the current Power 11 design.
9223-22SIBM Power H922S (9223-22S)
The 9223-22S is end-of-life Power 9 SAP HANA hardware. Compare its certified Linux workload with Power 11 L1122 or L1124.
9223-42HIBM Power H924 (9223-42H)
The 9223-42H is end-of-life Power 9 hardware. Match its SAP HANA, AIX, IBM i, or Linux workload to the current Power 11 design.
9223-42SIBM Power H924S (9223-42S)
The 9223-42S is end-of-life Power 9 SAP HANA hardware. Compare its certified Linux workload with Power 11 L1124.
9040-MR9IBM Power E950 (9040-MR9)
The 9040-MR9 is end-of-life Power 9 enterprise hardware for AIX and Linux, not IBM i. Compare its workload with Power 11 E1150.
9080-M9SIBM Power E980 (9080-M9S)
The 9080-M9S is end-of-life Power 9 enterprise hardware. Use its IBM i, AIX, or Linux workload to size Power 11 E1180.